Commit 5b2722a3 authored by Karsten Loesing's avatar Karsten Loesing
Browse files

Mark August items done, add more items for September.

parent 1d423058
Loading
Loading
Loading
Loading
+28 −22
Original line number Diff line number Diff line
@@ -97,23 +97,33 @@ Tasks for July:

Tasks for August:

 . Evaluate Roger's reduced circuit window patch
 o Evaluate Roger's reduced circuit window patch
  o Compare 40 and 50 KiB downloads.

 - PETS 2009
*  - Aug 5-7: Attend conference, plus 4 days travelling.

 - HAR 2009
*  - Aug 13-16: Attend conference, plus 2 days travelling.
 o PETS 2009
*  o Aug 5-7: Attend conference, plus 4 days travelling.

 - Configure Mike's bandwidth scanner on gabelmoo
   - Include measured bandwidths in votes
 o HAR 2009
*  o Aug 13-16: Attend conference, plus 2 days travelling.

 . Statistics proposal (include dirreq/entry/buffer/exit statistics in
 o Statistics proposal (include dirreq/entry/buffer/exit statistics in
   extra-info documents)
   . Implement proposal
   - After receiving a HUP signal, don't print out that stats will be
   o Implement proposal
   o After receiving a HUP signal, don't print out that stats will be
     written in 24 hours from then on.
   - Include patch in git master
   o Include patch in git master

 o Cells in circuit queues
*  o August 31: Write report on measured cell stats data; analyze results
*    for "1.2, new circuit window sizes. make the default package window
*    lower" and "2.1, squeeze loud circuits" in performance roadmap.

---------------------------------------------------------------------------

Tasks for September or later:

 . Configure Mike's bandwidth scanner on gabelmoo
   . Include measured bandwidths in votes

 . Exiting traffic by port
*  . July 31: Evaluate data together with Steven. Write report on measured
@@ -127,23 +137,19 @@ Tasks for August:

 - Client requests to directories
   - Compare bytes.txt output to dirreq download times
   - Analyze directory requests by end of July which are running for about
     two months by then.
   - Figure out why estimations are that far off. Where is the flaw in the
     math?

 . Cells in circuit queues
*  . August 31: Write report on measured cell stats data; analyze results
*    for "1.2, new circuit window sizes. make the default package window
*    lower" and "2.1, squeeze loud circuits" in performance roadmap.

 - Clients connecting to entry nodes
*  - July 31: Write report on measured entry stats data.

---------------------------------------------------------------------------

Tasks for September or later:
 - Circuit build timeouts
   - Find out why there are bumps at full seconds even though seconds start
     at random times on the relays; possibly measure full distributions of
     cell times in circuit queues, not just the deciles.

 - Evaluate Roger's reduced circuit window patch
   - Switch to 1 MiB downloads
 - Work organization
   - Add medium and low priority items from Roger's performance mail to
     this list, too. This list contains only the two high priority items.