Retire Tom's default bridge

The following bridge will shut down on August 31st because the operator's (CCed) contract ends at the end of the month:

  • 85.17.30.79:443

We should start the process of removing the bridge. I'll push a tor-browser-build patch in a minute.

To upload designs, you'll need to enable LFS and have an admin enable hashed storage. More information