Deliverable List for Sponsor E, September 15, 2011
Translations
- Translation infrastructure:
- Done: There's no development work that needs doing to help our partner translate our software. The translation status for Arabic and Farsi as of September 8, 2011 is listed here. [Runa]
Tor Relay
- IPv6
- Done: Posted IPv6 challenges for Tor on the blog. [Nick]
Torouter
- Excito B3
- Done: Waiting for Excito to release the B3 with Tor installed. [Runa]
- Deferred: Need to find testers and support them during a test phase. Pending on Excito (release planned for end of September); deferred until March 2012. Progress, plan for tester selection, support and feedback is documented on doc/Torouter/ExcitoB3. [Runa]
- Cloud images
- Done: Develop Amazon cloud images for non-technical users (#3033 (moved)). Progress is documented on doc/AmazonCloud [Runa, SiNA]
- Done: Estimate average/maximum cost of running a bridge in the cloud (#3574 (closed)). The answer is; about $30 if you write/read 10GB a week. [Runa]
- Done: Experiment with change-my-IP interface. See #3606 (closed). Users can get a new IP address by stopping and starting their EC2 instance. [Runa]
Tor bundles/installation
- Bridge/Relay-by-default bundles
- Done: See August 2011 deliverables for sponsor D. [erinn]
Analysis
- Bridge reachability
- Done: Wrote a case study to analyze whether we can detect that a bridge is blocked by looking at the stats the bridge reports (#4030 (moved)). [karsten]