Skip to content
GitLab
Projects Groups Snippets
  • /
  • Help
    • Help
    • Support
    • Community forum
    • Submit feedback
    • Contribute to GitLab
  • Sign in
  • Tor Tor
  • Project information
    • Project information
    • Activity
    • Labels
    • Members
  • Repository
    • Repository
    • Files
    • Commits
    • Branches
    • Tags
    • Contributors
    • Graph
    • Compare
  • Issues 328
    • Issues 328
    • List
    • Boards
    • Service Desk
    • Milestones
  • Merge requests 32
    • Merge requests 32
  • CI/CD
    • CI/CD
    • Pipelines
    • Jobs
    • Schedules
  • Deployments
    • Deployments
    • Environments
    • Releases
  • Monitor
    • Monitor
    • Incidents
  • Analytics
    • Analytics
    • Value stream
    • CI/CD
    • Repository
  • Activity
  • Graph
  • Create a new issue
  • Jobs
  • Commits
  • Issue Boards
Collapse sidebar
  • The Tor Project
  • Core
  • TorTor
  • Issues
  • #40154
Closed
Open
Issue created Oct 02, 2020 by Gaba@gaba🗝Owner

3.2: Deploy the best algorithms and parameters from evaluation in 3.1.

After this initial simulation, we will:

  • 3.2.1: Refine implementations in these areas based on those simulation results and any subsequent research in these areas and prepare the most promising options and parameter values for test and deployment on the live Tor network.
  • 3.2.2: Deploy these systems on the live Tor network, and further tune the parameters of these new systems, using the methods detailed in Objective 1.1, while also leveraging lessons learned from the work in that objective towards tuning our existing systems.
  • 3.2.3: Monitor the impact of these improvements on our live performance metrics, and ensure that we see similar results as were found in simulation.
  • 3.2.4: Monitor network health and overload metrics from Objective 4 during this deployment to ensure these systems do indeed reduce overload and congestion on the network, and do not introduce bugs or new reliability or performance issues.
Edited Oct 05, 2020 by Gaba
To upload designs, you'll need to enable LFS and have an admin enable hashed storage. More information
Assignee
Assign to
Time tracking