"fabric" did not exist on "83093dea8aee85168181c84d456d121e1a31c858"

anarcat
authored
The rationale here is that Ganeti has its own inventory and capacity evaluation system, so we do not *need* the Spreadsheet for that purpose. We still do need the spreadsheet for cost tracking however, so keep the documentation procedure for machines that "are not in Ganeti", basically.