Unverified Commit 5de6af96 authored by anarcat's avatar anarcat
Browse files

clarify deadline in summary

parent f04f16e2
Loading
Loading
Loading
Loading
+1 −1
Original line number Diff line number Diff line
@@ -8,7 +8,7 @@ builds operational. Non-critical websites (e.g. documentation) will be
built by GitLab CI and served by GitLab pages. Critical websites
(e.g. main website) will be built by GitLab CI and served by the
static mirror system. Teams are responsible for migrating their jobs,
with assistance from TPA.
with assistance from TPA, by the end of the summer (September 1st 2021).

[[_TOC_]]