Skip to content
Snippets Groups Projects
Closed Make sure that the control measurement is for the specific bridge measurement
  • View options
  • Make sure that the control measurement is for the specific bridge measurement

  • View options
  • Closed Issue created by Trac

    Control measurements are used in order to determine the status of a bridge measurement. Currently we simply search for the control measurement that has the closest start time, ignoring which bridge was scanned by the control measurement.

    This results in add_status_field() not correctly setting the status attribute which in turn leads to incorrect stati being exported from the ooni data analytics pipeline.

    Trac:
    Username: otr

    Linked items ... 0

  • Activity

    • All activity
    • Comments only
    • History only
    • Newest first
    • Oldest first
    Loading Loading Loading Loading Loading Loading Loading Loading Loading Loading