Skip to content
Snippets Groups Projects
  • anarcat's avatar
    83093dea
    stop using the spreadsheet for the ganeti cluster · 83093dea
    anarcat authored
    The rationale here is that Ganeti has its own inventory and capacity
    evaluation system, so we do not *need* the Spreadsheet for that
    purpose. We still do need the spreadsheet for cost tracking however,
    so keep the documentation procedure for machines that "are not in
    Ganeti", basically.
    Verified
    83093dea
    History
    stop using the spreadsheet for the ganeti cluster
    anarcat authored
    The rationale here is that Ganeti has its own inventory and capacity
    evaluation system, so we do not *need* the Spreadsheet for that
    purpose. We still do need the spreadsheet for cost tracking however,
    so keep the documentation procedure for machines that "are not in
    Ganeti", basically.